The Alaska Native Tribal Health Consortium is excited to invite Alaska Native and American Indian artists to submit artwork proposals for a new facility that will play a vital role in the Alaska Tribal Health System. The ANTHC Short-Term Skilled Nursing Facility, located on Ambassador Drive in Anchorage, will help people continue healing after a hospital stay, providing nursing care, rehabilitation, and physical recovery support before they safely return home. This addresses a significant gap in the system of care.

Read More »
construction

Emergency Services Expansion Update – June 18, 2026

Basement, Level 1, and Level 3 mechanical, electrical, and plumbing installations continue, as does work on the drywall finishes of the basement walls. Also in progress is electrical and plumbing in-wall on Level 1; layout for Core and Shell for Levels 1-6; and interior wall layouts throughout the structure.  Demolition and installation work will continue on the west side of the hospital through 2027 for fueling and liquid oxygen infrastructure.   Elevator 17/18 shaft wall drywall has started and stairwell shaft walls and handrails are almost complete on all levels. Exterior curtain wall work has also begun.

Read More »

Emergency Services Expansion Update – June 4, 2026 

Basement, Level 1, and Level 3 mechanical, electrical, and plumbing installations continue, as does work on the drywall finishes of the basement walls. Also in progress is electrical and plumbing in-wall on Level 1;  layout for Core and Shell for Levels 1-5; and interior wall layouts throughout the structure.   Concrete slab work has now been completed for Levels 1-7, and the basement-Level 5 have been fireproofed.   Upcoming construction this month includes putting up the exterior curtain wall, and elevator shaft 9 will be upgraded into a 2-hour rated MEP shaft assembly. Scheduled completion is by mid-June.   Civil work at the north end

Read More »

Emergency Services Expansion Update – May 21, 2026 

Basement, Level 1, and Level 3 mechanical, electrical, and plumbing installations continue, as is interior wall framing on Level 1.   We have moved on to drywall top out in the Level 1 interior walls, and fireproofing on Level 4.   Concrete slab work has now been completed on Levels 1-6, and the structural steel supports have been placed for elevator shaft 15/16.   Upcoming construction this month includes exterior framing on Level 1 and exterior curtain wall work.   In June, work at the north end of the parking lot will commence, and demolition work

Read More »

Emergency Services Expansion Update – May 7, 2026 

Basement, Level 1, and Level 3 mechanical, electrical, and plumbing installations are in progress. Drywall installation is in progress in the basement and on Level 1 interior walls, as are the in-wall rough ins of conduit and electrical boxes on the Level 1 interior wall. Level 1 interior wall framing more broadly is also ongoing.   Air Handler Units are being prepped for connection at Level 3.   Concrete slab work is completed on Levels 1-5.  Upcoming construction for the month includes: exterior framing on Level 1; exterior curtain wall work; and construction commencement on the West side of the

Read More »

Mental Health Awareness Month

May is Mental Health Awareness Month In honor of May’s Mental Health Awareness Month, ANTHC is promoting activities to reflect on our day, show we care, connect with others, and support each other’s paths to wellness, to have more good days.   Online Activity  This year, we will host an online activity for all Alaska residents. The activity highlights reflecting on what a good day looks like to you, practicing self-care, connecting and empowering, and finding your path to wellness.   In

Read More »

Emergency Services Expansion Update – April 9, 2026 

Basement and Level 1 drywall, mechanical, electrical, and plumbing installations are in progress. Air Handler Units are being prepped for connection at level 3.   Hanger installation for ceiling infrastructure is ongoing on Levels 1 and 3. Brick demolition is ongoing at the east side of level 3 on the existing hospital.   Level 1 interior wall framing has started, and fireproofing of structural steel on Levels 2 and 3 is complete.    Upcoming construction includes: Work on Level 6 concrete placement and Level 1 exterior framing is expected to commence later this month; Fuel storage infrastructure on the west side of the hospital and exterior curtain wall work will commence in

Read More »

Skilled Nursing Facility Update – April 7, 2026 

There are fewer coats out there and we’ve even spotted someone in a short-sleeved shirt!  Here’s what our team shared about the progress of their work so far this month:   Note: “Phase” refers to the area or section being worked on. Each phase includes the first floor, second floor, and roof. See Phase map below.  Upcoming Milestones:  This is a new build construction project on the corner of Ambassador Drive and Elmore Road. There should not be direct impacts to departments, although visitors to campus will most likely notice the construction activity. Noise levels will rise in

Read More »

Skilled Nursing Facility Update – March 24, 2026 

Work continues through the month of March! Here’s what our team is working on:    Note: “Phase” refers to the area or section being worked on. Each phase includes the first floor, second floor, and roof. See Phase map below.  Upcoming Milestones:  This is a new build construction project on the corner of Ambassador Drive and Elmore Road. There should not be direct impacts to departments, although visitors to campus will most likely notice the construction activity. Noise levels will rise in the immediate vicinity due to heavy equipment operation. 

Read More »

Emergency Services Expansion Update – March 23, 2026 

Work that is ongoing includes basement drywall, mechanical, electrical, and plumbing installations; hanger installation on Level 1 for ceiling infrastructure; fireproofing on Levels 2 and 3; and brick demolition on the north side of Level 4 on the existing hospital.  Concrete slab work is complete on Levels 1-4. Air Handler Units are being craned into the building at level 3.   On the horizon, concrete placement for Level 5 and exterior framing on Level 1 will begin in April; the exterior curtain wall work will commence in late May; and work on the north end of the parking lot will commence in June.   Potential Operational Impacts   Air intake plenums installed to improve air flow

Read More »

Skilled Nursing Facility Update – March 10, 2026 

Despite the snow and cold, our construction team has been making great progress this month. They’ve completed completed roof sections over phases 2 and 3, roughed in the ductwork on the first floor of phase 4, and backfilled and poured slab in the final phase. Fire proofers are finished in phase 2 and are now working on phase 3.   Note: “Phase” refers to the area or section being worked on. Each phase includes the first floor, second floor, and roof. See Phase map below.  Upcoming Milestones: 

Read More »

ANTHC Epidemiology hosts inaugural Tribal Public Health Summit 

From February 18-19, 2026, ANTHC’s Epidemiology Center hosted the first Alaska Tribal Public Health Summit. The goal: Bring together Tribal leaders and staff from across the state to work on creative, collaborative solutions for a changing public health landscape.   ANTHC’s strategic plan for addressing the health needs of our people involves strengthening Tribal partnerships, which means investing purposefully in the improvement of public health across all Alaska Native communities. To do that, ANTHC has been conducting public health assessments both internally within the Consortium, and externally within the Alaska Tribal Health System.    “There were many calls throughout all of